Contact Sher Worldwide #sw for inspection and offer submission
Product Number: SW-TSHD-AKF7636-1227th May 2025 Panama-Flagged 2012 TSHD Dredger for Sale - Fully Refurbished & Ready for Operations | SHER Worldwide Direct Seller to Sher Worldwide. Key Highlights for Buyers: DIRECT SELLER TO OWNER: Streamlined transaction process. 2012 Panama-Flagged Trailing Suction Hopper Dredger: Modern and reliable vessel. DUAL CLASSIFICATION: BV and IBS: Ensures
27th May 2025
Panama-Flagged 2012 TSHD Dredger for Sale - Fully Refurbished & Ready for Operations | SHER Worldwide
Direct Seller to Sher Worldwide.
DIRECT SELLER TO OWNER: Streamlined transaction process.
2012 Panama-Flagged Trailing Suction Hopper Dredger: Modern and reliable vessel.
DUAL CLASSIFICATION: BV and IBS: Ensures highest safety and operational standards.
MAJOR REFURBISHMENT COMPLETED: During recent dry docking, ensuring peak performance and longevity.
HIGH PRODUCTION CAPACITY: Designed for efficient dredging operations.
VERSATILE DREDGING SYSTEM: Double winches, double pumps, double dredgers for optimal flexibility.
Q: What is the vessel's flag and class? A: Registered under the Panama flag and dual classification BV and IBS.
Q: When was the vessel built and what recent work has been done? A: Built: 2012. Major refurbishment completed during dry docking.
Q: What are the main dimensions and capacities of the dredger? A:
Overall Length (LOA): 116.95m
Width: 22.00m
Molded Depth: 8.90m
Deadweight Tonnage (DWT): 10,650
Mud Tank Capacity: 7,047 m^3
Q: What are the vessel's speed capabilities? A:
Maximum Ship Speed: 13.0 kts
Dredging Speed: 1 ~ 3 kts
Q: What type of main engines and propulsion does it have? A: Main Engine: STX-MAN Diesel Engine 3500KW (750rpm) * 2 units. Propulsion Equipment: CPP (4-blade nozzle) * 2.
Q: What are the key features of the dredging system? A:
Dredging Pump: 1,685 KW * 2 units
Sand Pump Flow Rate: 12,000 m^3/hr
Sand Pump Diameter: 900 mm
Full Load Time: 1 hr
Dredging System: Double winches, double pumps, double dredgers
Dredger Length: 34m (effective dredging depth 27m)
Q: What are the fuel and oil consumption rates? A:
Anchorage Motor Fuel Consumption: 300 LT/day
Lubricating Oil Consumption: 10 LT/day
Q: What are the tank capacities? A:
Fuel Tank Capacity: 700 m^3
Pressure Water Tank Capacity: 657.3 m^3
Freshwater Tank Capacity: 330 m^3
Q: What kind of cranes are on board? A:
12T * 15m * 1 unit (bow)
10T * 18m * 1 unit (stern)
0.9T * 6m * 1 unit (left)
0.9T * 8m * 1 unit (right)
Q: What are the crew capacities? A:
Maximum Crew Quota: 27 people
Minimum Safety Quota: 14 people
Q: What are the sand pumping equipment details? A:
Mud Tanks * 14 sets
Bottom discharge: No. 1 & 7 Compartment, two-stage opening: 100 and 1,030mm. Other compartments fully open mode: 1,030mm.
Bow Blow: Bow Blow—2,000m (no shore booster pump)
Bow Jet: Bow rainbow—50m
High-Pressure Flushing Equipment: 1,257 KW * 2 (3,240 m^3/hr)
Water Jet Pressure: 20 kg/cm^2
Q: Where can the vessel be inspected? A: Inspection and delivery: China.
Flag: Panama
Class: BV and IBS (Dual Classification)
Built: 2012
Major Refurbishment: During Dry Docking
Maximum Ship Speed: 13.0 kts
Dredging Speed: 1 ~ 3 kts
Gross Tonnage (GRT): 7,636
Net Tonnage (NT): 2,290
Deadweight Tonnage (DWT): 10,650
Endurance: 25 days
Overall Length (LOA): 116.95m
Width: 22.00m
Molded Depth: 8.90m
Maximum Summer Draft: 6.8m
Maximum Dredging Draft: 7.8m
Main Engine: STX-MAN Diesel Engine 3500KW (750rpm) * 2 units
Propulsion Equipment: CPP (4-blade nozzle) * 2
Generator: 425 KW * 3 units
Bow Thruster: 375 KW
Windlass: Hydraulic Ele. Motor Type * 2 units (9m/sec)
Cranes:
12T * 15m * 1 unit (bow)
10T * 18m * 1 unit (stern)
0.9T * 6m * 1 unit (left)
0.9T * 8m * 1 unit (right)
Dredging Pump: 1,685 KW * 2 units
Sand Pump Flow Rate: 12,000 m^3/hr
Sand Pump Diameter: 900 mm
Full Load Time: 1 hr
Anchorage Motor Fuel Consumption: 300 LT/day
Lubricating Oil Consumption: 10 LT/day
Fuel Tank Capacity: 700 m^3
Pressure Water Tank Capacity: 657.3 m^3
Freshwater Tank Capacity: 330 m^3
Mud Tank Capacity: 7,047 m^3
Maximum Crew Quota: 27 people
Minimum Safety Quota: 14 people
Sand Pumping Equipment:
Mud Tanks * 14 sets
Bottom discharge: No. 1 & 7 Compartment, two-stage opening: 100 and 1,030mm. Other compartments fully open mode: 1,030mm
Bow Blow: Bow Blow—2,000m (no shore booster pump)
Bow Jet: Bow rainbow—50m
High-Pressure Flushing Equipment: 1,257 KW * 2 (3,240 m^3/hr)
Water Jet Pressure:** 20 kg/cm^2
Dredging System: Double winches, double pumps, double dredgers
Dredger Length: 34m (effective dredging depth 27m)
Production Capacity: Meter 2 (mud pump outlet)
Inspection and Delivery: China
It will be revealed to very serious & committed buyers only upon full business & background disclosure.
To ensure mutual respect for time and resources, we require:
Clear Budget Levels: Aligned with international market rates.
End Buyer Background Disclosure: Serious named buyers only.
Email: "Mr.Sher (VESSELS) Singapore - Malaysia - S&P" <sw@sher-worldwide.com> / "Mr.Sher (VESSELS) Singapore - Malaysia - S&P" <sherworldwidetrading@gmail.com>
T&Cs apply as per website. Details believed correct at the time of advertising. Vessels/items offered “as is where is,” subject to prior sale or withdrawal. SW not liable for errors or omissions and reserves the right to amend contents without notice.
#DredgerForSale #TSHD #ShipSale #MarineVessel #SherWorldwide #PanamaFlagged #Dredging
No Record Found!